Foundation Solutions / Services

Move earth.Build certainty.

Integrated foundation drilling, civil, transmission, cable and heavy-equipment capability for demanding Saudi project environments.

Explore Services

Complete project solutions

End-to-end capability with one field focus: controlled execution.

Foundation Solutions delivers integrated engineering and construction services for power, infrastructure and industrial projects, combining technical excellence, operational efficiency and uncompromising safety.

Drill the foundation
Build the structure
Connect the network
Mobilize the field

The service loader

One machine. Eight field capabilities.

01 / FoundationDeep works

Foundation & auger drilling

Deep, organized foundation drilling executed with powerful rigs and qualified operators. FSC coordinates with main contractors and consultants while maintaining high safety, accuracy and quality standards.

Auger drillingRotary drillingDeep foundationsZR185 / KR125A
02 / CivilIntegrated works

Civil & infrastructure works

Site preparation, backfilling, leveling, transmission-line construction zones, structure and equipment areas delivered in coordination with approved drawings, material requirements and project stages.

Site preparationBackfillingLevelingInfrastructure
03 / ConcreteStructural support

Concrete works

Reinforced concrete foundations, pads, platforms and supporting structures coordinated with excavation, casting and inspection activities to provide durability, stability and operational readiness.

FoundationsStructure padsPlatformsQuality monitoring
04 / EarthworksSite movement

Earthworks, access roads & structure pads

Temporary equipment routes and internal project roads, including leveling, backfilling, compaction and route preparation for safe heavy-equipment movement and reduced execution delays.

Access roadsCompactionHeavy routesStructure pads
05 / TransmissionNetwork works

Transmission line construction

Integrated overhead transmission line works coordinated with foundations, civil work fronts, access routes and field logistics to support efficient power-infrastructure delivery.

OHTLPower infrastructureWork-front coordination
06 / AssemblyVertical works

Tower erection & assembly

Transmission tower erection and assembly supported by qualified teams, lifting equipment, structured sequencing and continuous coordination with project requirements.

Tower erectionAssemblyLifting supportField teams
07 / StringingOHTL & UG

Conductor, OPGW & UG cable installation

Overhead conductor and OPGW stringing plus underground cable pulling, supported by high-capacity hydraulic and electric pulling equipment for controlled network installation.

ConductorsOPGWUG cablePulling systems
08 / EquipmentRental & support

Heavy equipment solutions

Short- or long-term equipment provision with technical support, operation, maintenance and delivery to site, reducing operational burden while keeping projects productive.

Rig rentalTechnical supportOperationMaintenanceSite delivery

Heavy equipment capability

The fleet behind the work.

FSC deploys rotary and auger drill rigs, pulling systems, generators, trucks, lowbed trailers, 4x4 vehicles, compaction equipment and field support assets for projects of different sizes and conditions.

foundationRotary & auger rigsDeep foundation drilling capability
precision_manufacturingCable pulling systemsOHTL and underground operations
local_shippingTransport & liftingTrucks, lowbeds and boom support
constructionSite supportPower, welding and compaction

Zoomlion’s ZR185 combines fast transport, stable operation and high-torque drilling. It can travel with the Kelly bar installed, reducing transport cost by up to 30%, while its big-flow main pump, multi-gear rotary drive and two-speed crowd cylinder improve efficiency.

Max. diameter1,500 mm
Max. depth56 m / 44 m
Output torque185 kN·m
Rotary speed5-33 rpm
Crowd push / pull160 / 160 kN
Crowd stroke4,500 mm
Main winch pull160 kN
Aux. winch pull80 kN
EngineCummins QSC8.3 / 181 kW
Operating weight55 tons
Traction / speed330 kN / 2.1 km/h
Depth with extensionUp to 62 m

A compact rotary rig for flexible foundation works, delivering 125 kN·m torque with drilling depth up to 43/37 m and diameter up to 1,500/1,300 mm.

Max. torque125 kN·m
Drilling diameter1,500 / 1,300 mm
Drilling depth43 / 37 m
Working speed6-30 rpm
Hoist capacity150 kN
Main winch110 kN / 78 m/min
Auxiliary winch60 kN / 60 m/min
Cylinder stroke3,200 mm
System pressure34.3 MPa
Travel / pull3 km/h / 220 kN
Total weight35 tons

Electric pulling equipment for cable and rope stringing with heat-treated steel bull-wheel grooves and capacity for one rope up to 13 mm diameter.

Max. pull50 kN / 11,240 lbf
Speed at max. pull10 m/min
Max. speed70 m/min
Pull at max. speed5 kN
Rope diameter13 mm
Bull wheel / grooves300 mm / 8
Rope capacity900 m
Weight2,350 / 3,815 kg
Dimensions190 × 102 × 93 in

Heavy-duty hydraulic pulling system for overhead and underground cable or rope stringing, handling one rope up to 28 mm diameter with heat-treated steel bull-wheel grooves.

Max. pull180 kN / 40,500 lbf
Speed at max. pull2.5 km/h
Max. speed4.5 km/h
Bull-wheel diameter700 mm
Max. rope diameter28 mm
Weight without rope7,200 kg
Engine power210 kW / 281 hp
Emission levelTier 4f / Stage IV
SystemsLiquid / 24 V

Underground rope and stringing puller with durable heat-treated bull-wheel grooves, suitable for a single rope up to 16 mm diameter.

Max. pull100 kN / 22,500 lbf
Speed at max. pull0.9 km/h
Max. speed2.0 km/h
Pull at max. speed40 kN
Bull-wheel diameter400 mm
Max. rope diameter16 mm
Weight with rope5,530 kg
Reel capacity1,250 m
EngineTier 4f / 55 kW
SystemsLiquid / 12 V
XCMG XR178ERotary drilling rig / 58 m depth
KR360C auger drill56 m depth capability
FAW boom truckFASSI 10-ton crane
Miller welding machine400 amp field welding
Loader CE0426Earthworks and material support
4×4 fleetToyota Hilux and Isuzu D-Max pickups
Auger attachment3 m depth capacity
Honda generator12 kVA field power
Compaction equipmentVibration and ground-preparation support

Controlled delivery

The service is more than the machine.

FSC studies the site, selects equipment, mobilizes the team and coordinates every work front through delivery.

01

Site preparation & mobilization

Inspect conditions, define work points, prepare routes, verify equipment readiness and coordinate team mobilization for a strong, safe start.

location_searching
02

Project management

Study requirements, select suitable equipment, prepare the execution plan and maintain coordination with clients, contractors and consultants.

account_tree
03

Operational efficiency

Assign tasks accurately, manage time, reduce unnecessary downtime and monitor equipment and manpower performance.

speed
04

Quality control

Monitor excavation, concrete, backfilling, leveling and equipment operation against technical specifications and project requirements.

fact_check
05

Safety commitment

Protect people, equipment and property through preventive planning, suitable equipment, continuous site monitoring and team guidance.

health_and_safety

Bring the requirement

We bring the field capability.

Discuss drilling, civil, transmission, cable or heavy-equipment requirements with Foundation Solutions.

Start a Conversation